Visit Kaster at PACK EXPO International, October 18–21, 2026, McCormick Place, Chicago, Illinois, USA.

ERP decides what a plant should make. The schedule decides what it actually runs, and that is where capacity quietly disappears: into cleaning windows, campaign boundaries, equipment qualification, and batches waiting on QA release. At PACK EXPO, Kaster is at booth W-22060 alongside OPTEL, showing what constraint-based scheduling does to a week once those rules are enforced rather than remembered.

Why it matters

A GMP plant rarely needs more capacity. It needs the capacity it already has to stop being spent on rebuilding the schedule by hand every time something slips.

Meet us in Chicago

Booth W-22060, McCormick Place, October 18–21, 2026.

Your lines are running. But are they running right?

Book a Demo