For many organizations, synchronizing operations and ensuring tools are sterile at the right time and place can be a major bottleneck in the production line. Ensuring sterility and quality of pharmaceutical products when using autoclaves is crucial to the drug manufacturing process.
Our platform, PlaniKast, automatically generates and optimizes sterilization plan that assigns parts to autoclave loads based on your validated patterns, available inventories, duration of each type of loads and sterile holding times.
The integration and deployment phase is usually completed within a few weeks so drug manufacturers can see results quickly and see a positive ROI between 3 to 12 months.
Kaster was built by a team of industrial engineers, software developers and optimization specialists in partnership with Polytechnique Montréal, a public research university affiliated with Université de Montréal in Canada.
Integrated into your processes, Kaster’s software takes into account all production rules, constraints and objectives to perform simulations and automatically generate production plans that make the best use of available resources.